top of page

Renovation of Staff Facilities for Constance Lemuria
Praslin
Seychelles
The office was tasked with the refurbishment of the staff toilet, shower and changing facilities of the hotel.
The layout will be going through some changes and the walls and existing fixtures to be stripped back, to allow for the new interior design.
Materials, Fixtures and finishes were selected with care, with emphasis on values such as durability, reliability, craftsmanship and longevity.

proposed layout 1

Colour texture and fixture proposal

proposed layout 1
1/2
bottom of page